Workplace design – flood protection
This article needs more work. To help develop this article click 'Edit this article' above.
The Herne Hill floods in August 2013 were a disaster for many homes and businesses.
As any residents and business owners who have been through it can testify, if you have ever received a phone call in the early hours telling you a burst water main has flooded your property, you will realise that is only the start of your problems. In a home your furniture etc. is ruined. In a business you can lose stock, books, materials – many of your assets – as well as power supplies and IT.
- Don’t think: it won’t happen to me: it could.
- Even if your premises are on top of a hill, a leak from a sprinkler system, a tank, pipe or a burst water main outside could still flood your basement/ground floor.
- Even if you are on an upper floor of a multi-storey building, the incoming power, phone lines, boards and IT may be located in the basement or on the ground floor and are quite likely to fail, affecting your business.
The loss adjusters and salvage teams will be quick enough to get your effects and equipment cleared out of the premises as it’s in their interests to minimise the consequential costs of claims. But the disruption caused to your business can be very serious financially.
Like fire, water main bursts and similar problems often seem to happen out of normal work hours. Visitors, trainees, other customers with appointments arriving the next day therefore may not be able to be contacted until they turn up and then have to be turned away. This is not good for customer relations.
So here is some advice based on experience:
- If your business premises include a basement or ground floor make sure that IT and power supplies are flood protected as much as possible.
- Do not locate IT equipment or any business-critical items in a basement if you can avoid it
- Install “bund wall” protection (at least 30cms high) around power or IT supplies that have to be positioned on the floor to reduce the risk of any flood water reaching them.
- Install step-over threshold barriers that will hold back water to doors to power supply rooms in basements.
- Install a plinth, ideally at least 30cms high in basement or ground floor areas wherever possible and place storage cabinets and other vulnerable items on top of the plinth.
- Keep high value or hard-to-replace items on shelving or in storage well above floor level or in the middle or higher drawers of cabinets, not in/on the bottom drawer/shelf;
- Have a disaster recovery / contingency plan in place to activate if a problem arises. Ensure it includes a plan for how to notify customers of any emergency. You may not be able to move to another site but you could back-up data to standalone memory / disks / servers or a data centre, have emergency supplies at off-site storage. Consider asking external trainees / customers to give you their mobile phone number “in case of emergency”;
- In the event of a flood, if at all possible, do not agree to close the file on damage claims with until at least 6 months have elapsed. Materials that have been in contact with water may deteriorate or rot well after the event.
It may never happen but, if it does, at least be prepared.
[edit] Related articles on Designing Buildings Wiki
- Flood.
- Flood and water management act.
- FloodSax.
- Flood resilient construction.
- Planning for floods.
- BRE flood resilient repair project.
- BREEAM Flood risk management.
- Building flood resilience.
- Changing attitudes to property flood resilience in the UK.
- Fighting flooding in the 21st century.
- Flood defences.
- Flood resilient house.
- Pitt Review Lessons learned from the 2007 floods.
- Planning for floods.
- Property flood resilience.
- Pumps and dewatering equipment.
- Temporary flood defences.
- Ten years on - Lessons from the Flood on building resilience.
- Thames barrier.
- Workplace design – flood protection.
Featured articles and news
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.
70+ experts appointed to public sector fire safety framework
The Fire Safety (FS2) Framework from LHC Procurement.
Project and programme management codes of practice
CIOB publications for built environment professionals.
The ECA Industry Awards 2024 now open !
Recognising the best in the electrotechnical industry.
Sustainable development concepts decade by decade.
The regenerative structural engineer
A call for design that will repair the natural world.
Buildings that mimic the restorative aspects found in nature.
CIAT publishes Principal Designer Competency Framework
For those considering applying for registration as a PD.
BSRIA Building Reg's guidance: The second staircase
An overview focusing on aspects which most affect the building services industry.
Design codes and pattern books
Harmonious proportions and golden sections.
Introducing or next Guest Editor Arun Baybars
Practising architect and design panel review member.
Quick summary by size, shape, test, material, use or bonding..