Workplace design – flood protection
This article needs more work. To help develop this article click 'Edit this article' above.
The Herne Hill floods in August 2013 were a disaster for many homes and businesses.
As any residents and business owners who have been through it can testify, if you have ever received a phone call in the early hours telling you a burst water main has flooded your property, you will realise that is only the start of your problems. In a home your furniture etc. is ruined. In a business you can lose stock, books, materials – many of your assets – as well as power supplies and IT.
- Don’t think: it won’t happen to me: it could.
- Even if your premises are on top of a hill, a leak from a sprinkler system, a tank, pipe or a burst water main outside could still flood your basement/ground floor.
- Even if you are on an upper floor of a multi-storey building, the incoming power, phone lines, boards and IT may be located in the basement or on the ground floor and are quite likely to fail, affecting your business.
The loss adjusters and salvage teams will be quick enough to get your effects and equipment cleared out of the premises as it’s in their interests to minimise the consequential costs of claims. But the disruption caused to your business can be very serious financially.
Like fire, water main bursts and similar problems often seem to happen out of normal work hours. Visitors, trainees, other customers with appointments arriving the next day therefore may not be able to be contacted until they turn up and then have to be turned away. This is not good for customer relations.
So here is some advice based on experience:
- If your business premises include a basement or ground floor make sure that IT and power supplies are flood protected as much as possible.
- Do not locate IT equipment or any business-critical items in a basement if you can avoid it
- Install “bund wall” protection (at least 30cms high) around power or IT supplies that have to be positioned on the floor to reduce the risk of any flood water reaching them.
- Install step-over threshold barriers that will hold back water to doors to power supply rooms in basements.
- Install a plinth, ideally at least 30cms high in basement or ground floor areas wherever possible and place storage cabinets and other vulnerable items on top of the plinth.
- Keep high value or hard-to-replace items on shelving or in storage well above floor level or in the middle or higher drawers of cabinets, not in/on the bottom drawer/shelf;
- Have a disaster recovery / contingency plan in place to activate if a problem arises. Ensure it includes a plan for how to notify customers of any emergency. You may not be able to move to another site but you could back-up data to standalone memory / disks / servers or a data centre, have emergency supplies at off-site storage. Consider asking external trainees / customers to give you their mobile phone number “in case of emergency”;
- In the event of a flood, if at all possible, do not agree to close the file on damage claims with until at least 6 months have elapsed. Materials that have been in contact with water may deteriorate or rot well after the event.
It may never happen but, if it does, at least be prepared.
[edit] Related articles on Designing Buildings Wiki
- Flood.
- Flood and water management act.
- FloodSax.
- Flood resilient construction.
- Planning for floods.
- BRE flood resilient repair project.
- BREEAM Flood risk management.
- Building flood resilience.
- Changing attitudes to property flood resilience in the UK.
- Fighting flooding in the 21st century.
- Flood defences.
- Flood resilient house.
- Pitt Review Lessons learned from the 2007 floods.
- Planning for floods.
- Property flood resilience.
- Pumps and dewatering equipment.
- Temporary flood defences.
- Ten years on - Lessons from the Flood on building resilience.
- Thames barrier.
- Workplace design – flood protection.
Featured articles and news
Plumbing and heating for sustainability in new properties
Technical Engineer runs through changes in regulations, innovations in materials, and product systems.
Awareness of the Carbon Border Adjustment Mechanism
What CBAM is and what to do about it.
The new towns and strategic environmental assessments
12 locations of the New Towns Taskforce reduced to 7 within the new towns draft programme and open consultation.
Buildings that changed the future of architecture. Book review.
The Sustainability Pathfinder© Handbook
Built environment agency launches free Pathfinder© tool to help businesses progress sustainability strategies.
Government outcome to the late payment consultation, ECA reacts.
IHBC 2025 Gus Astley Student Award winners
Work on the role of hewing in UK historic conservation a win for Jack Parker of Oxford Brookes University.
Future Homes Building Standards and plug-in solar
Parts F and L amendments, the availability of solar panels and industry responses.
How later living housing can help solve the housing crisis
Unlocking homes, unlocking lives.
Preparing safety case reports for HRBs under the BSA
A new practical guide to preparing structural inputs for safety cases and safety case reports published by IStructE.
Male construction workers and prostate cancer
CIOB and Prostate Cancer UK encourage awareness of prostate cancer risks, and what to do about it.
The changed R&D tax landscape for Architects
Specialist gives a recap on tax changes for Research and Development, via the ACA newsletter.
Structured product data as a competitive advantage
NBS explain why accessible product data that works across digital systems is key.
Welsh retrofit workforce assessment
Welsh Government report confirms Wales faces major electrical skills shortage, warns ECA.
A now architectural practice looks back at its concept project for a sustainable oceanic settlement 25 years on.
Copyright and Artificial Intelligence
Government report and back track on copyright opt out for AI training but no clear preferred alternative as yet.
Embedding AI tools into architectural education
Beyond the render: LMU share how student led research is shaping the future of visualisation workflows.
Why document control still fails UK construction projects
A Chartered Quantity Surveyor explains what needs to change and how.
Inspiration for a new 2026 wave of Irish construction professionals.
New planning reforms and Warm Homes Bill
Take centre stage at UK Construction Week London.